First intermodal facility in the Bronx to handle transfer of wastes from trucks to rail without touching the ground
Analyzed the demolition of derrick crane located at Port Authority in Staten Island. Some of the cranes are 120 tons to be removed without touching the ground deck.
Analyzed the structural stability of uniques cranes for structural stability during movement of the crance carrying heavy loads.
Designed standby battery park serice for Nassau County Bus station located in Garden City
Performed analysis of a uniquely built up coring rig mounted on a Truck for coring up to 24-inches on JFK runway
Designed contamination systems for dewatering of contaminated sites during the installation of sheet piles in restricted areas.